aboutGolf Simulator

Started by chin, 28 July 2010, 01:16:03

Previous topic - Next topic

chin

I am installing this golf simulator in the office.
http://aboutgolf.com/

Their Aisan rep is Shuzi Golf
http://www.shuzigolf.com/

chin

#1
The components arrived last Thursday. Installation scheduled next Monday.

The following pictures are for the aboutGolf folks to check the condition and quantity of the components.

The shipment arrived in two big boxes, plus a flat package, plus two metal pieces. This picture is after unpacking the two big boxes. The flat package is apparently a calibration board.

chin

First close up are the "structural" components.

The two metal pieces are some kind of mounting frame?
3 ball joint like mounts.
2 piece of clamp like thingy to join/hold the ball-like structure on the metal piece?
The sand/rough mat.
Marked balls.
Tees.
The long wire looks like to connect the power supply and the lamp.

chin

Some of the connectors:

2 firewire-to-usb (y-shape usb?)
2 long firewire cable.
1 Ethernet like cable.
Power supply, for the lamp?

chin

#4
Sensors related

1 transformer like in metal housing (left back)
2 camera for ball tracking (middle back)
2 housing cases for the cameras? (right back)
The lamp housing, with bulb?
2 regular GE spot light bulb (MR16)?
2 cameras for the Video Trac (Downgraded already?)
Firewire card for PC
Simulator software CD

I installed the CD in a test computer. It's the game and driving range, with the included golf courses. I am not sure the Video Trac software is also inside. The version is 1.701.

chin

More connectors

1 bag of fastening plastic,
1 USB hub
3 USB cable (flat to square connector)
1 USB extension cord
1 Ethernet or phone cable like connector
4 rolls of?

chin

Screen

1 mesh screen for hooking up to the metal frame already in place
1 soft cloth (screen?)
2 camera stand wrap (for the ball cam or the video trac cam?)
2 very large piece of black cloth with Velcro

chin

Another view of the components. (OK not the scissors.  ;D)

chin

I forgot to take a picture of the metal frame already in place. I will post in the morning.

hangchoi

They start the installation on Monday? How long will it take for the whole installation??
「吾心信其可行,則移山倒海之難,終有成功之日。吾心信其不可行,則反掌折枝之易,亦無收效之期也。」